Tender due and no time to measure every trade off the drawings? Send us the drawings and we take off the lot to NRM2, real quantities you can price straight from. Fixed fee quote back, full takeoff to your deadline.
A quantity takeoff is the measure of every material and component off your drawings, so you know the true scope before you price. It's the basis of every construction estimate, cost plan and bill of quantities, with nothing missed. We give you accurate, trade-by-trade quantities for tendering and ordering, so you don't overprice and lose the job, or underprice and lose money on it.
We measure every trade off your drawings, from structure and finishes to mechanical, electrical and external works, to NRM2 on real current UK rates. Nothing left out, so you price the whole job.
The real material takeoff, open on screen, no email needed. Forward the Excel straight to your suppliers for pricing or purchase orders.
An exact list of every material the job needs, from substructure to finishes, measured off your drawings to NRM2.
The tender's due and there's no time to measure it all. We take off every trade off your drawings to NRM2 on real UK rates, so you and your suppliers price from real quantities, not guesswork.
Every trade measured off your drawings to NRM2, so no item slips through before you price.
Every measurement checked back against your drawings, so the quantities are right.
Real measured quantities you and your suppliers can price from, no guesswork.
The same numbers carry through to your construction estimate, cost plan and BoQ.
Give us the bid date. A few working days standard, express when it's tight.
Measured by a team with 25+ years on UK sites who know how a real job gets built.
Your plans, sketches or specs, whatever you have.
Every element measured off your drawings to NRM2 on real UK rates.
Editable files, ready to price or forward to suppliers for ordering.
No two jobs price the same, so we don't guess. Whatever you're pricing, we measure the whole job off your drawings to NRM2, so you and your suppliers work from the same quantities.
Pricing a full tender with no time to measure it all? We take off the whole job to NRM2 and give you a number you can bid from.
Pricing your package for a main contractor? We measure your scope off the drawings, so you bid keen without getting caught short.
No QS in the office? You don't need one. Send the drawings, we do the takeoff, and you get measured quantities you can stand behind.
Pricing a job for a client? We turn your drawings into a clean, measured takeoff, so you order the right amount.
Got the takeoff and need the rest? We can price the whole tender, set the budget with a cost plan, or turn the drawings into a bill of quantities.
We measure the whole job off your drawings and price it to NRM2 on real UK rates.
See construction estimating →We break the job down to NRM2 on real UK rates, so you set a budget the job can be built to.
See cost planning →A clean, itemised schedule to NRM2, so every trade prices the same scope.
See BoQ preparation →Not sure how it works or what you get? Here are the questions contractors ask us most about a quantity takeoff, answered straight.
Send us your drawings and get a fixed fee quote back, with quantities measured to NRM2 and delivered to your deadline.