Quantity takeoff

No time to measure it all? We do the takeoff.

Tender due and no time to measure every trade off the drawings? Send us the drawings and we take off the lot to NRM2, real quantities you can price straight from. Fixed fee quote back, full takeoff to your deadline.

Priced to NRM2 Fixed fee up front Delivered to your deadline
material-takeoff · measured to NRM2
What's been measured
Substructure, measured to NRM2
Superstructure, every element counted
Roofing, quantities off the drawings
Fit-out, nothing missed or bundled
Total materials, £44,428
What it is

Every trade measured off your drawings

A quantity takeoff is the measure of every material and component off your drawings, so you know the true scope before you price. It's the basis of every construction estimate, cost plan and bill of quantities, with nothing missed. We give you accurate, trade-by-trade quantities for tendering and ordering, so you don't overprice and lose the job, or underprice and lose money on it.

Material quantities for every tradeMeasured in m2, m3 or linear units.
Elemental and trade-based summariesEasy to check against your drawings.
Ties into your BoQ and cost planSame numbers carried straight through.
What's included

Measured quantities you can price straight from

We measure every trade off your drawings, from structure and finishes to mechanical, electrical and external works, to NRM2 on real current UK rates. Nothing left out, so you price the whole job.

Detailed measurement sheetsBroken down by trade, element and component.
Material and labour quantitiesMeasured straight off your drawings.
Elemental summaries to NRM2Ready for estimating and cost planning.
Clear scope notes and assumptionsSo you see exactly what's included.
Editable filesDelivered in PDF and Excel for pricing or tender.
Send your drawings
Sample material takeoff

See exactly what you and your suppliers would price from

The real material takeoff, open on screen, no email needed. Forward the Excel straight to your suppliers for pricing or purchase orders.

Scroll inside to browse the full material takeoff ↓
MATERIAL TAKEOFF
Single Storey Rear Extension
14 Oakfield Road, London SW00 0AA
Prepared forMr & Mrs Sample
Prepared byMy Project Estimating
ReferenceMPE-2026-014-MTO
Measured toNRM2
Date4 July 2026
£44,428.34 materials, excluding VAT

An itemised list of the materials measured off your drawings to NRM2, grouped by trade and element. Forward the Excel straight to your suppliers for pricing or purchase orders. This is a sample document. Quantities must be verified on site before ordering.

MaterialQtyUnitRateTotal
SUBSTRUCTURE£5,818.74
Foundations£4,025.34
Concrete
Ready-mix concrete C25, foundations22.4m3£142.00£3,180.80
Ready-mix concrete C25, part load charge2each£68.75£137.50
Reinforcement
A252 reinforcing mesh 4.8m x 2.4m6each£52.44£314.64
Plastic mesh spacers 40-50mm40each£0.58£23.20
Damp Proofing
1200g DPM sheet50m2£3.10£155.00
Sand blinding42m2£5.10£214.20
Ground Floor Slab£1,793.40
Insulation
100mm PIR floor insulation board42m2£21.40£898.80
Concrete
Ready-mix concrete C25, slab6.3m3£142.00£894.60
SUPERSTRUCTURE£7,178.20
External Walls£5,454.20
Brickwork & Blockwork
Facing bricks to match existing3200each£0.72£2,304.00
Concrete blocks 100mm780each£1.65£1,287.00
Wall ties, stainless steel500each£0.28£140.00
Cavity insulation batts 100mm78m2£12.40£967.20
Mortar
Cement 25kg bags60each£6.20£372.00
Building sand, bulk bag8each£48.00£384.00
Structural Openings£1,724.00
Steelwork
Universal beam 203x133 UB, rear opening1each£1,650.00£1,650.00
Padstones, concrete4each£18.50£74.00
ROOFING£6,773.20
Flat Roof£6,773.20
Timber & Deck
Roof joists C24 47x220mm14each£34.00£476.00
Firring pieces12each£9.50£114.00
OSB3 deck board 18mm15each£28.60£429.00
Insulation & Covering
150mm PIR warm roof insulation42m2£28.50£1,197.00
Single-ply membrane46m2£18.20£837.20
Membrane trims and fixings1item£240.00£240.00
Rooflights & Rainwater
Fixed rooflight 1000x1500mm2each£1,250.00£2,500.00
Fascia, soffit and rainwater goods1item£980.00£980.00
EXTERNAL ENVELOPE£6,920.00
Windows & Doors£6,920.00
Glazing
Aluminium bi-fold door set 3.6m1each£4,200.00£4,200.00
Double glazed window units4each£680.00£2,720.00
INTERNAL FINISHES£3,938.20
Walls & Ceilings£848.20
Plasterboard & Plaster
Plasterboard 12.5mm 2400x120034each£11.80£401.20
Plaster finish 25kg30each£8.90£267.00
Jointing and scrim1item£180.00£180.00
Floors£2,334.00
Screed & Finish
Floor screed 25kg60each£7.40£444.00
Floor finish supply, PC allowance42m2£45.00£1,890.00
Heating£756.00
Underfloor Heating
Underfloor heating kit42m2£18.00£756.00
FIT-OUT£13,800.00
Kitchen & Sanitaryware£13,800.00
PC Allowances
Kitchen units and worktops, PC sum1sum£12,000.00£12,000.00
Sanitaryware to WC, PC sum1sum£1,800.00£1,800.00

Material Summary

Total materials (excl. VAT)£44,428.34
Note: this is a sample material takeoff for illustration. Rates are indicative and PC sums are allowances only. All quantities must be verified on site before any materials are ordered. Figured dimensions take precedence over scaled dimensions.
My Project Estimating  •  60 Tottenham Court Road, Office 676, London W1T 2EW
Company No. 11255002
info@myprojectestimating.co.uk  •  020 3576 2913  •  myprojectestimating.co.uk

What you receive

An exact list of every material the job needs, from substructure to finishes, measured off your drawings to NRM2.

Comprehensive material listMaterials, sizes, quantities and unit rates by trade.
Measured quantitiesEach component measured off your drawings and specifications.
Trade-by-trade organisationGrouped by section, so you find what you need fast.
Unit costs and subtotalsRate for each material, subtotal per section.
Ready for orderingForward the Excel straight to suppliers.
Send your drawings
Why contractors send us their drawings

Real measured quantities you can price from

The tender's due and there's no time to measure it all. We take off every trade off your drawings to NRM2 on real UK rates, so you and your suppliers price from real quantities, not guesswork.

Nothing missed

Every trade measured off your drawings to NRM2, so no item slips through before you price.

Cross-checked

Every measurement checked back against your drawings, so the quantities are right.

Priced straight from

Real measured quantities you and your suppliers can price from, no guesswork.

Ties into your estimate

The same numbers carry through to your construction estimate, cost plan and BoQ.

Delivered to your deadline

Give us the bid date. A few working days standard, express when it's tight.

25+ years, contractor-side

Measured by a team with 25+ years on UK sites who know how a real job gets built.

How it works

From your drawings to quantities you can order from

1

Send your drawings

Your plans, sketches or specs, whatever you have.

2

We measure every trade

Every element measured off your drawings to NRM2 on real UK rates.

3

Delivered to your deadline

Editable files, ready to price or forward to suppliers for ordering.

Send your drawings
Common questions

FAQs about our quantity takeoff

Not sure how it works or what you get? Here are the questions contractors ask us most about a quantity takeoff, answered straight.

What does your quantity takeoff service include? +
We measure every trade and element off your drawings to NRM2. You get detailed measurement sheets, material and labour quantities, elemental summaries and scope notes, in PDF and Excel, ready to price from.
How long does a takeoff take? +
Standard turnaround is a few working days. Give us your bid date and we deliver to it. If your deadline is tight, express is available for an extra fee.
Can you do a takeoff from partial or early drawings? +
Yes. We match the level of detail to what you've got, and flag clearly what's measured and what's still to confirm as the drawings develop.
Do you provide editable quantity sheets? +
Yes. Every takeoff comes in both PDF and Excel, so you can price it, adjust it, or drop it straight into your own workbook.
Do the quantities tie in with a BoQ and cost plan? +
Yes. Everything is measured to NRM2, so the same numbers carry through to your bill of quantities, cost plan and construction estimate.

No time to measure it all? We do the takeoff.

Send us your drawings and get a fixed fee quote back, with quantities measured to NRM2 and delivered to your deadline.