FOR UK CONTRACTORS
Priced estimates from someone who's run the jobs, not just priced them.
25+ years contractor-side. We measure and price your tender the way you’d do it yourself if you had the time. Send your drawings today, get a fixed fee quote back the same day, full estimate delivered to your deadline.
Give us the bid date and your full priced estimate arrives before it, never holding up work.
Every element measured off your drawings to NRM2. A missed line dents your margin, we price it.
You see the fee up front before you commit, with no hourly billing and no surprises later.
BUILT BY PEOPLE WHO'VE RUN THE JOBS
Why builders send us their drawings
No two jobs price the same, so we don’t guess. We measure your job off the drawings and price it on real UK rates, whether you need a full construction estimate or a quantity takeoff for tender. Even without a QS in the office, you get numbers you can bid from and stand behind.
You know where every pound goes
Every item priced and laid out clear, with a full bill of quantities you can hand to the client. No hidden extras, no guesswork - you see exactly what's in the number before it goes in your bid.
Nothing left off, no nasty surprises
We measure the whole job from your drawings so nothing slips through. One missing line can eat your margin once you're on site, so we price it all. Planning ahead? Our cost planning keeps the budget straight from the start.
25+ years, contractor-side
This isn't a faceless estimating factory. Your job is measured by a team with 25+ years on UK sites, contractor-side, who know how a real job actually gets built.
What we price for you
Send us your drawings and we do the measuring and pricing, so you can bid on time without doing takeoffs at night. Whether it’s a full estimate, a takeoff, or a bill of quantities for tender, you get numbers you can stand behind. Built for contractors and subcontractors without a QS in the office.
No time to price the tender? We do it for you.
Send the drawings and we turn them into a full priced estimate on real UK rates. You get back to running your jobs while we do the measuring, and the estimate lands before your deadline, ready to bid from.
Know what the job costs before you price it.
We work out the cost of structure, finishes and services up front, so the budget is straight from the start. No nasty surprises halfway through, and no going back to the client cap in hand.
Exact quantities, so nothing gets missed.
We measure every trade and material off your drawings, in full. A missed line is a hole in your margin once you’re on site, so we count it all and you price with confidence.
A clean breakdown you can hand to the client.
We turn your drawings into a clear, itemised bill of quantities under NRM2. Easy to read, ready for tender, and it makes you look like the outfit that has it together.
Three steps from drawings to a priced estimate
No back-and-forth, no jargon. Send your drawings and get a number you can bid from.
We believe construction cost planning should be straightforward and stress-free.
Our four-stage process keeps every project organised, transparent, and accurate from day one.
Step 01
Step 02
Step 03
WORK WE PRICE
Whatever you're bidding, we'll price it
Pricing a whole tender or your own single package, we do the takeoff and give you a number to bid from. Built for contractors and subcontractors without a QS in the office.
New build, fit-out or refurb, the whole job to bid.
Bidding a job with a dozen trades and no time to measure it all? We take off the whole tender from your drawings and price every element to NRM2, materials, labour, plant and preliminaries. You get a clean, itemised estimate to put straight into your bid now.
Your trade, your scope, priced for the GC bid.
Pricing your own package for a main contractor? We measure your scope off the drawings and price it on real UK rates, nothing missed and nothing padded, so you bid competitively without getting caught short once you’re out on site.
ESTIMATING
Single Storey Rear Extension
| Prepared for | Mr & Mrs Sample |
| Prepared by | My Project Estimating |
| Reference | MPE-2026-014 |
| Date | 4 July 2026 |
| Valid for | 90 days from date of issue |
Contents
- 1. Executive Summary
- 2. Basis of Estimate
- 3. Drawings & Information Relied Upon
- 4. Pricing Summary by Stage
- 5. Preliminaries
- 6. Detailed Stage Breakdown
- 7. PC Sums & Provisional Sums
- 8. Value Engineering Options
- 9. Assumptions
- 10. Exclusions
- 11. Qualifications & Site Verification
- 12. Stage Payment Schedule
- 13. Next Steps
- 14. Standard Terms
1Executive Summary
This report sets out our estimate for the construction of a single storey rear extension at 14 Oakfield Road, London SW00 0AA, providing approximately 42 m² additional floor area. It has been prepared for Mr & Mrs Sample on the basis of the drawings and information listed in Section 2.
The net total of £128,788.03 includes overheads and profit at 8% and a construction contingency at 5%. With VAT at 20%, the total is £154,545.64.
The estimate carries PC and provisional sums totalling £27,414.00 for items not yet finally selected (Section 7). We have also set out value engineering options in Section 8 that could reduce the cost by up to £7,150.00 if adopted.
This is an estimate rather than a fixed-price tender. It should be read together with the assumptions, exclusions and qualifications, which define exactly what is and is not included. All dimensions must be verified on site before ordering or starting work.
2Basis of Estimate
This estimate has been prepared on the following basis. Where information was not available, a reasonable allowance has been made and identified as a PC or provisional sum.
| Project | Single Storey Rear Extension, 42 m² additional floor area |
| Location | 14 Oakfield Road, London SW00 0AA |
| Scope | Construction of the extension including groundworks, structure, roof, external envelope, first and second fix, finishes, kitchen and sanitaryware installation, and associated external works. |
| Measurement | Quantities measured from the listed drawings in accordance with NRM2 principles. |
| Pricing | Current UK market labour and material rates at the date of issue. |
| Programme | Single continuous build assumed. No allowance for phasing or accelerated working. |
| Contract | Assumed a standard domestic building contract. Not yet agreed. |
If any of the above changes, in particular a drawing revision or a change of specification, the estimate should be revisited.
3Drawings & Information Relied Upon
This estimate is based on the following drawings and their revisions. Pricing relates to these revisions only. A later revision may change quantities and cost.
| Drawing | Title | Rev | Originator |
|---|---|---|---|
| A-100 | Existing plans and elevations | Rev C | Sample Architects Ltd |
| A-101 | Proposed ground floor plan | Rev D | Sample Architects Ltd |
| A-102 | Proposed elevations and section | Rev D | Sample Architects Ltd |
| A-200 | Proposed roof plan | Rev B | Sample Architects Ltd |
| S-01 | Structural layout and beam schedule | Rev B | Consulting Structural Engineer |
| S-02 | Foundation details | Rev A | Consulting Structural Engineer |
4Pricing Summary by Stage
The table below summarises the net cost of each stage of the works, excluding VAT. Preliminaries are shown in Section 5 and a full breakdown of every stage follows in Section 6.
| Stage | Net (excl. VAT) |
|---|---|
| Preliminaries | £17,640.00 |
| Groundworks & Foundations | £10,452.40 |
| Superstructure & Walls | £21,350.00 |
| Roofing | £9,976.00 |
| Windows & External Doors | £8,020.00 |
| First Fix M&E | £6,478.00 |
| Internal Finishes | £15,585.30 |
| Kitchen & Sanitaryware | £17,550.00 |
| External Works | £6,920.00 |
| Net works | £113,971.70 |
| Overheads & profit @ 8% | £9,117.74 |
| Construction contingency @ 5% | £5,698.59 |
| Net total (excl. VAT) | £128,788.03 |
| VAT @ 20% | £25,757.61 |
5Preliminaries
Preliminaries cover the cost of running the project that is not tied to a single trade, site set-up, management, access, welfare, temporary works and general attendance. They are listed as items and priced for a build of this size and duration.
| Item | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Site set-up, welfare unit and temporary fencing | 1 | item | £2,850.00 | £2,850.00 |
| Scaffolding to rear elevation, 12 week hire | 1 | item | £3,420.00 | £3,420.00 |
| Skip hire and waste removal, 6 x 8yd | 6 | each | £285.00 | £1,710.00 |
| Site management and supervision | 12 | week | £640.00 | £7,680.00 |
| Temporary services, protection and general attendance | 1 | item | £1,980.00 | £1,980.00 |
| Total preliminaries | £17,640.00 | |||
Preliminaries are time-related. A longer programme, or a stop-start programme, would increase this figure.
6Detailed Stage Breakdown
Each stage is broken down into its works. Under every work, costs are grouped into materials, labour and plant. Rates are net of VAT and reflect current UK market prices.
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| Reduce level dig and cart away spoil | 38 | m3 | £46.50 | £1,767.00 |
| Excavate for trench fill foundations | 22.4 | m3 | £52.00 | £1,164.80 |
| Plant | ||||
| 3 Tonne excavator hire | 3 | day | £195.00 | £585.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Ready-mix C25 concrete | 22.4 | m3 | £142.00 | £3,180.80 |
| Sand blinding and 1200g DPM | 42 | m2 | £9.80 | £411.60 |
| 100mm PIR floor insulation | 42 | m2 | £21.40 | £898.80 |
| Labour | ||||
| Pour foundations, lay and power-float slab | 42 | m2 | £58.20 | £2,444.40 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Facing brick, block and cavity materials | 78 | m2 | £118.00 | £9,204.00 |
| Facing bricks to match existing (PC allowance) | 3.2 | 1000 | £720.00 | £2,304.00 |
| Labour | ||||
| Bricklaying and blockwork to cavity wall | 78 | m2 | £50.00 | £3,900.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Steel beam to rear opening | 1 | item | £1,650.00 | £1,650.00 |
| Labour | ||||
| Install steel, padstones and make good | 1 | item | £2,680.00 | £2,680.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Blockwork and ties | 26 | m2 | £24.00 | £624.00 |
| Labour | ||||
| Build internal partitions | 26 | m2 | £38.00 | £988.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Firrings, joists and 18mm deck | 42 | m2 | £34.00 | £1,428.00 |
| Labour | ||||
| Construct flat roof structure | 42 | m2 | £26.00 | £1,092.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| 150mm PIR warm roof insulation | 42 | m2 | £28.50 | £1,197.00 |
| Labour | ||||
| Lay and fix insulation boards | 42 | m2 | £9.50 | £399.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Single-ply membrane and trims | 42 | m2 | £22.00 | £924.00 |
| Labour | ||||
| Install single-ply covering and detailing | 42 | m2 | £18.00 | £756.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Rooflights, 2 no. (PC allowance) | 2 | each | £1,250.00 | £2,500.00 |
| Fascia, soffit and rainwater goods | 1 | item | £980.00 | £980.00 |
| Labour | ||||
| Install rooflights and rainwater goods | 1 | item | £700.00 | £700.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Aluminium bi-fold doors, 3.6m (PC allowance) | 1 | each | £4,200.00 | £4,200.00 |
| Labour | ||||
| Install bi-fold door set and make good | 1 | each | £480.00 | £480.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Double glazed windows, 4 no. (PC allowance) | 4 | each | £680.00 | £2,720.00 |
| Labour | ||||
| Install windows and make good | 4 | each | £155.00 | £620.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| First fix electrics to extension | 1 | item | £2,450.00 | £2,450.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| First fix plumbing and heating, 3 radiators | 1 | item | £2,180.00 | £2,180.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Underfloor heating kit | 42 | m2 | £18.00 | £756.00 |
| Labour | ||||
| Install underfloor heating | 42 | m2 | £26.00 | £1,092.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Plasterboard, skim and screed materials | 1 | item | £2,400.00 | £2,400.00 |
| Labour | ||||
| Plaster, skim and screed | 210 | m2 | £21.53 | £4,521.30 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Floor finish supply (PC allowance) | 42 | m2 | £45.00 | £1,890.00 |
| Labour | ||||
| Prepare and lay floor finish | 42 | m2 | £22.00 | £924.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| Painting and decorating throughout | 1 | item | £3,200.00 | £3,200.00 |
| Second fix joinery, skirting and architrave | 1 | item | £2,650.00 | £2,650.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Kitchen units and worktops (PC sum) | 1 | sum | £12,000.00 | £12,000.00 |
| Labour | ||||
| Install kitchen and connect appliances | 1 | item | £2,400.00 | £2,400.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Material | ||||
| Sanitaryware to WC (PC sum) | 1 | sum | £1,800.00 | £1,800.00 |
| Labour | ||||
| Second fix plumbing and sanitaryware | 1 | item | £1,350.00 | £1,350.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| Rebuild patio and level rear garden | 1 | item | £3,850.00 | £3,850.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| Drainage connections and gullies | 1 | item | £1,420.00 | £1,420.00 |
| Description | Qty | Unit | Rate | Net |
|---|---|---|---|---|
| Labour | ||||
| Make good at junction with existing house | 1 | item | £1,650.00 | £1,650.00 |
7PC Sums & Provisional Sums
The items below are allowances, not fixed prices. A Prime Cost (PC) sum is money set aside for materials or fittings not yet finally selected. A provisional sum is money set aside for work that cannot yet be precisely measured. Each is reconciled against the actual cost once selections and details are confirmed.
| Item | Type | Allowance (excl. VAT) |
|---|---|---|
| Facing bricks to match existing | PC Sum | £2,304.00 |
| Rooflights (2 no.) | PC Sum | £2,500.00 |
| Aluminium bi-fold doors, 3.6m | PC Sum | £4,200.00 |
| Windows to extension (4 no.) | PC Sum | £2,720.00 |
| Floor finish supply | PC Sum | £1,890.00 |
| Kitchen units and worktops | PC Sum | £12,000.00 |
| Sanitaryware to WC | PC Sum | £1,800.00 |
| Total allowances | £27,414.00 | |
8Value Engineering Options
The following options could reduce the cost without changing the size or layout of the extension. They are optional. Each shows the saving against the net total and a short note on the trade-off. We are happy to talk any of them through.
| Option | Area | Saving |
|---|---|---|
| Single-ply membrane roof to a high-performance felt system Reduces roof cost with a proven felt build-up. Slightly shorter guarantee period. | Roofing | −£1,260.00 |
| Aluminium bi-fold to uPVC French doors with side lights Lower-cost door set. Reduces the opening's slimline appearance. | Windows | −£2,350.00 |
| Porcelain floor tiles to engineered timber / LVT Alternative floor finish at a lower supply rate. Subject to selection. | Finishes | −£840.00 |
| Standard rooflights to fixed frameless units Fixed instead of opening rooflights. Loses ventilation via the roof. | Roofing | −£700.00 |
| Client-supplied kitchen (trade discount retained by client) Client procures kitchen directly. MPE installs only. Removes our PC margin. | Kitchen | −£2,000.00 |
| Maximum saving if all options adopted | −£7,150.00 | |
9Assumptions
This estimate is prepared on the following assumptions. If any prove incorrect, the price may change.
- Pricing is based on the drawings and revisions listed in the Basis of Estimate. Any subsequent revision may change the price.
- Works are assumed to proceed continuously, with clear and uninterrupted access to the rear of the property throughout.
- Existing foundations, drains and services are assumed sound and in the positions indicated. Any diversions are excluded.
- Ground is assumed to be firm and free from rock, running water, contamination or made ground. Standard trench-fill depths assumed.
- Existing walls where the extension connects are assumed sound and suitable to be built off and made good.
- Mains water, drainage and electricity are available at the property and of adequate capacity.
- All PC and provisional sums are allowances only and will be reconciled against actual selections and costs.
- Working hours are standard weekday hours. No allowance is made for weekend, night or accelerated working.
10Exclusions
The following are not included in this estimate. If any are required, they can be priced separately on request.
- VAT reliefs or zero-rating (priced at standard rate unless confirmed otherwise)
- Party wall awards, surveyor fees and any associated works
- Planning fees, building control fees and statutory charges
- Architect, structural engineer and other consultant fees
- Asbestos survey, removal or licensed disposal
- Removal of unforeseen obstructions, rock, contaminated or made ground
- Diversion or upgrade of existing incoming services and meters
- Tree removal, root protection measures and arboricultural works
- Landscaping and planting beyond the patio and levelling stated
- Loose furniture, white goods and appliances (unless within a stated PC sum)
- Works to the existing house beyond making good at the junction with the extension
- Temporary alternative accommodation for the client during the works
11Qualifications & Site Verification
This estimate is issued subject to the following qualifications.
- All dimensions and quantities are taken from the drawings listed and MUST be verified on site before any materials are ordered or works commence.
- This is an estimate, not a fixed-price tender. Final cost is subject to confirmed selections, site conditions and any design development.
- Where a specification is not yet fixed, a reasonable allowance has been made and flagged as a PC or provisional sum.
- Structural elements are priced to the engineer's current design. Any change following building control review may affect the price.
- The estimate assumes a single continuous build programme. A phased or stop-start programme would be repriced.
- Prices are held for the validity period stated on the cover. Beyond that, material prices in particular are subject to review.
12Stage Payment Schedule
On acceptance we would propose the following stage payments, each due on completion of the stage and against a valuation. Percentages are of the net total (excl. VAT). VAT is added to each payment.
| Stage | % | Net amount |
|---|---|---|
| Mobilisation / deposit on acceptance | 10% | £12,878.80 |
| Groundworks and foundations complete | 20% | £25,757.61 |
| Superstructure and roof watertight | 25% | £32,197.01 |
| First fix M&E and plastering complete | 20% | £25,757.61 |
| Second fix, kitchen and finishes complete | 20% | £25,757.61 |
| Practical completion and snagging signed off | 5% | £6,439.40 |
| Net total | 100% | £128,788.03 |
This is an indicative schedule for discussion. Final stage payments are agreed and set out in the building contract.
13Next Steps
To move this forward:
- Review this estimate and the assumptions, exclusions and qualifications in full.
- Confirm any PC and provisional sum selections so those allowances can be firmed up.
- Let us know which, if any, value engineering options you would like us to apply.
- On acceptance, we issue a contract sum, programme and a stage payment schedule.
- Contact us with any queries and we will be happy to talk them through.
We look forward to hearing from you.
My Project Estimating
info@myprojectestimating.co.uk • 020 3576 2913
myprojectestimating.co.uk
14Standard Terms
This estimate is issued on the following terms. It is an estimate of likely cost based on the information available at the date of issue and is not a fixed-price tender or an offer to contract. Prices are held for 90 days from the date of issue, after which they are subject to review, in particular material prices. Quantities are measured from the drawings listed and must be verified on site before ordering or commencing works. PC and provisional sums are allowances only and are reconciled against actual cost. The assumptions, exclusions and qualifications in this report form part of the estimate and define its scope. No liability is accepted for matters outside the stated scope or for changes arising from revised information, site conditions or design development. Any contract arising will be documented separately and will take precedence over this estimate.
Company No. 11255002
info@myprojectestimating.co.uk • myprojectestimating.co.uk
What You Receive
Every estimate comes as a complete, editable document – in PDF, Word and Excel. Everything you need to bid the job or hand it to your client, broken down and easy to read.
Cover Page
Your project title, address, and company details presented in a clean, professional layout.
Cover Letter
A short covering letter you can send straight to your client with the estimate.
Quote & Summary
The headline numbers – net, VAT and total – with each stage summarised so the price is clear at a glance.
Detailed Breakdown
Every element measured and priced, grouped into materials, labour and plant, so you see exactly where the cost sits.
Bill of Quantities
A clean, itemised BoQ measured to NRM2, ready for tender or to price against.
Preliminaries
Site set-up, management, access and temporary works, priced separately so nothing is hidden in the rates.
PC & Provisional Sums
Allowances for items not yet selected, listed clearly so you know what’s still to be confirmed.
Payment Schedule
A suggested stage payment schedule you can use to agree terms with your client.
Send Us Your Drawings
Send your drawings or project details and we’ll get straight to work on your estimate. Full measured takeoff, priced on real UK rates, delivered to your tender deadline. Built for contractors and subcontractors who need numbers they can bid from.
Who We Work With
Estimating built around how contractors work
We price for the people who bid and build the work, not the ones who commission it.
Main Contractors
Full measured takeoffs and priced estimates so you bid competitively without giving away your margin. Numbers you can submit with confidence.
Subcontractors
Your package measured and priced from the drawings, so you tender your trade accurately and don’t get caught short on site.
Small & Medium Builders
No QS in the office? We are your estimating team. Send the drawings, get back to running the job, and we’ll have your estimate ready.
Common Questions
Most Popular Questions.
Picking someone to price your job is a big call, so you’ll have questions. Here are the ones contractors ask us most, covering how we work, what’s included and how fast you’ll get your estimate. Can’t see what you need? Contact us and we’ll answer it straight.
A full measured takeoff and priced estimate, broken down into materials, labour, plant and preliminaries, with PC and provisional sums flagged. You get it as an editable document in PDF, Word and Excel, ready to bid from or hand to your client.
Standard turnaround is a few working days, depending on the size of the job. If you're up against a tight tender deadline, ask about our express service and we'll work to it.
No QS needed, that's what we're for. Just send whatever drawings, plans or sketches you have, tell us your deadline, and we'll take it from there.
A clean, itemised document in PDF, Word and Excel. Easy to read, easy to edit, and ready to drop straight into your bid or send to your client.
Every element is measured from your drawings to NRM2 and priced on current UK rates, so nothing's missed and nothing's padded. It's an estimate, not a fixed-price tender, so final cost depends on confirmed selections and site conditions, but you get numbers you can bid on with confidence.